Bishop Auckland
Our teams stripped and recovered terraced houses in Bishop Auckland, the works were instructed as they were in disrepair, the works included eave ventilation, new laths, breathable membrane, fibre cements slates and dry ridge installations.
Portrack Lane – Stockton
Installed new composite sheeting to a new build steel framed building, during the works we installed also installed all flashings closures and rain water goods.
Leechmire Farm – Hutton Henry
Strip and recover to the main house, during the works we installed fibre cement states, dry verge & hip system, removed a redundant chimney and completed the low-level porch pitched roof to the same standard.
Westwood Burn Farm – Wingate
Westwood Burn Farm was a partial strip and recover to a wing off of the main building, the tiles were a Neo pan tile and the works were completed due to perished felt and water ingress to the chimney, during the works the chimney lead was fully replaced.
Sandy Lane – Billingham
The team stripped and recovered 2nr lead bays, this was needed due to the bays needing copper strapping and geotextile underlay installing
Montrose Street – Darlington
Partial Fible Cement slate replacement due to the original slate being nail sick and the property having water ingress.
Victoria Court – Consett
Our client suffered a lead theft on site and required new flashings, Innovation Roofing installed Ubbink Ubiflex which is a non-lead flashing system, this will hopefully deter future thefts.
Get In Touch
We take on all types of jobs from small domestic work to larger commercial projects, all carried out to the highest standards, and at very competitive prices.